PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed gravel at the 1st floor Electrical-Boiler Room Facing West.jpg Laying block at the 2nd floor Detention cells Facing South.jpg Laying out block at the 1st floor IT Room Facing South.jpg Erecting the stone panels at the East Elevation 1.jpg Erecting the stone panels at the East Elevation 2.jpg Erecting the stone panels at the East Elevation 3.jpg Installing sprinkler branches-head at the 3rd floor Facing West.jpg Sprinkler heads at the 3rd floor Facing North.jpg
Previous pageNext page Erecting the stone panels at the East Elevation 2
Erecting the stone panels at the East Elevation 2